| Project Name | Kidston Pumped Hydro |
| Status | Under Construction |
| COD (Planned / Actual) | 2025 |
| Capacity (MW) | 250 |
| Energy Storage (GWh) | 2 |
| Duration (Hours) | 8 |
| Head (m) | 200 |
| Upper Reservoir Name | Kidston Pit 1 |
| Lower Reservoir Name | Kidston Pit 2 |
| Closed-Loop or Open-Loop | Closed-Loop |
| Location (State, Region) | QLD – Northern Inland |
| Coordinates | 18.875° S, 144.274° E |
| Developer / Owner | Genex Power |
| Transmission Link | NEM (QLD) |
| Estimated Cost (AUD) | 777 million |
| Funding / Partners | ARENA, NAIF, J-Power |
| Environmental Status | Approved |
| Construction Timeline | 2021–2025 |
| Job Creation (FTEs) | 500 |
| Integration Role | Solar+storage hybrid |
| Website | https://www.genexpower.com.au |
| References | Genex Power; ARENA |