Project Name ↑ Status ↕ COD ↕ Capacity (MW) ↕ Energy Storage (GWh) ↕
Baroota PHES Proposed — 270 2.2
Big-T Pumped Hydro Permitting / EIS 2026–2033 400 4
Borumba Dam PHES Proposed 2033 2000 48
Cultana Pumped Hydro Proposed — 225 1.8
Glenbawn PHES Early-stage — 770 7.7
Glennies Creek PHES Early-stage — 623 6.2
Goat Hill Pumped Hydro Proposed — 230 1.8
Kidston Pumped Hydro Under Construction 2025 250 2
Kiewa PHES conversion Early-stage — TBD —
Lake Cethana Pumped Hydro Proposed / EPBC Referral 2031 750 15