Under construction / connected; completion pending APH-COMM-001

Kidston Pumped Storage Hydro Project

Kidston / North Queensland · Queensland

Kidston Pumped Storage Hydro Project is a 250 MW energy storage project under construction in North Queensland.

250 MW · generation
2 GWh · storage
8 hours · design duration

Overview

Kidston Pumped Storage Hydro Project is a 250 MW energy storage project under construction in North Queensland. Genex Power, a wholly owned J-POWER subsidiary, is repurposing the former Kidston Gold Mine’s Wises and Eldridge pits as upper and lower reservoirs. The published design provides 2,000 MWh, or eight hours at rated output. Genex reports that the project was registered and connected to the National Electricity Market in November 2025, with final project completion expected in 2027. Connection is a milestone and does not establish full commercial operation.

Genex reports NEM registration and connection in November 2025; final project completion expected in 2027.

Key technical details

Developer / ownerGenex Power, wholly owned by J-POWER
Scheme typeMine-site closed-loop PHES
Open / closed loopClosed-loop / off-river mine-site
Greenfield / brownfieldBrownfield
Reservoir configurationExisting Wises and Eldridge mine pits.
Lower reservoirEldridge Pit
Upper reservoirWises Pit
Water source / first fillExisting Copperfield Dam pumping rights / project water supply.
Grid / REZ connectionNorth Queensland NEM; Kidston transmission line
Power / energy basisGenex states 250 MW for 8 hours, 2,000 MWh.
Brownfield basisRepurposes decommissioned Kidston gold mine pits.

Status, approvals & verification

StatusUnder construction / connected; completion pending
Status detailGenex reports NEM registration and connection in November 2025; final project completion expected in 2027.
Planning / approvals statusApproved with conditions; under construction / energisation track.
Target COD / timing2027 final project completion expected; full commercial operation not confirmed
Pipeline classificationUnder construction; not full commercial operation
Verification resultReviewed; source-supported with stated qualifications
Capacity basisPublished proposal or study design; not committed capacity
Storage basisPublished design / tender figure; see qualifications
Cost basis2021 funded construction cost; not refreshed outturn
Last checked2026-11-10
Source access limitationsGenex project details were obtained from its current indexed search extract; repeated direct fetches timed out.

Economics

Estimated costA$0.78 bn

Sources & location

Primary source ↗ Secondary source ↗ Reviewed evidence 1 ↗ Reviewed evidence 2 ↗

Source quality: Owner / regulator evidence; see field-level qualifications

Indicative location
Kidston mine area · Queensland
Regional anchor — not a verified project-site coordinate.
Anchor source ↗
View on the full map →
← Back to all projects

Working on this project?

Share useful sources, ask practical questions and connect with others interested in Australian pumped hydro.

Professional enquiries Join the LinkedIn group