PumpedHydro
Early development APH-PLAN-011

Glennies Creek Pumped Hydro Energy Storage

Glennies Creek Dam / Upper Hunter · New South Wales

Glennies Creek Pumped Hydro Energy Storage is an early-stage AGL proposal in the Upper Hunter region of New South Wales.

623 MW · generation
6.23 GWh · indicative
10 hours · design duration

Overview

Glennies Creek Pumped Hydro Energy Storage is an early-stage AGL proposal in the Upper Hunter region of New South Wales. AGL’s May 2025 acquisition announcement described a 623 MW, ten-hour design, implying 6.23 GWh at rated output. It was acquired alongside Glenbawn through Upper Hunter Hydro. These figures describe an announced development design, rather than installed or committed capacity. A current project-specific commissioning date and updated design were not confirmed in this review. Glennies Creek should remain separate from Glenbawn when tracking individual project milestones and capacity.

Early-stage project acquired by AGL in May 2025; no newer project-specific milestone confirmed.

Key technical details

Developer / ownerAGL
Scheme typeWaterNSW land/assets PHES
Open / closed loopOpen-loop / existing dam linked
Greenfield / brownfieldHybrid brownfield / greenfield
Reservoir configurationExisting Glennies Creek Dam and new upper reservoir.
Lower reservoirGlennies Creek Dam
Upper reservoirNew upper reservoir
Water source / first fillWaterNSW dam for initial fill and top-ups; water recirculated between reservoirs.
Grid / REZ connectionProposed Hunter–Central Coast REZ; detailed connection design under development
Power / energy basisAGL May 2025 acquisition design: 623 MW / 10h. 6.23 GWh calculated; latest design not reconfirmed.
Brownfield basisUses existing Glennies Creek Dam as lower reservoir; upper reservoir to be built.

Status, approvals & verification

StatusEarly development
Status detailEarly-stage project acquired by AGL in May 2025; no newer project-specific milestone confirmed.
Planning / approvals statusEarly-stage development in owner announcement; current detailed approval milestone not confirmed.
Target COD / timingTBC
Pipeline classificationProposal; exclude from committed totals
Verification resultHistorical design confirmed; current milestones unconfirmed
Capacity basisPublished proposal or study design; not committed capacity
Storage basisCalculated / indicative; see power/energy basis
Cost basisNot confirmed / not applicable
Last checked2026-11-10
Source access limitationsPublic page text or indexed primary-source evidence reviewed; publisher updates may lag events.

Sources & location

Primary source ↗ Secondary source ↗ Reviewed evidence 1 ↗ Reviewed evidence 2 ↗

Source quality: Historical primary evidence; current progress unconfirmed

Indicative location
Scone / Upper Hunter region · New South Wales
Regional anchor — not a verified project-site coordinate.
Anchor source ↗
View on the full map →
← Back to all projects

Working on this project?

Share useful sources, ask practical questions and connect with others interested in Australian pumped hydro.

Professional enquiries Join the LinkedIn group