Under construction APH-CONST-001

Snowy 2.0

Snowy Mountains · New South Wales

Snowy 2.0 is a pumped hydro expansion under construction in the Snowy Mountains of New South Wales.

2,200 MW · generation
350 GWh · storage
159.09 hours · design duration

Overview

Snowy 2.0 is a pumped hydro expansion under construction in the Snowy Mountains of New South Wales. Snowy Hydro’s published design provides 2,200 MW of generation and 350 GWh of energy storage by linking Tantangara and Talbingo reservoirs through tunnels and an underground power station. On 22 October 2026, Snowy Hydro announced a revised target cost of A$22.2 billion, with an allowance for a A$25 billion cost scenario. The project now targets full commissioning in late 2029. These figures replace the earlier A$12 billion estimate and end-2028 completion target.

Under construction. October 2026 reassessment updates target cost to A$22.2bn, with allowance for A$25bn cost scenario.

Key technical details

Developer / ownerSnowy Hydro
Scheme typeLarge pumped hydro expansion
Open / closed loopOpen-loop / existing hydro scheme linked
Greenfield / brownfieldBrownfield expansion
Reservoir configurationExisting Tantangara and Talbingo reservoirs connected by new tunnels and underground power station.
Lower reservoirTalbingo Reservoir
Upper reservoirTantangara Reservoir
Water source / first fillExisting Tantangara and Talbingo reservoirs; project water-transfer system.
Grid / REZ connectionNSW NEM; Snowy 2.0 transmission connection
Power / energy basisSnowy Hydro states 2,200 MW and 350 GWh; duration calculated.
Brownfield basisLinks existing Tantangara and Talbingo reservoirs in the Snowy Scheme.

Status, approvals & verification

StatusUnder construction
Status detailUnder construction. October 2026 reassessment updates target cost to A$22.2bn, with allowance for A$25bn cost scenario.
Planning / approvals statusNSW and EPBC approvals granted; multiple modifications.
Target COD / timingLate 2029 full commissioning target, announced 22 October 2026
Pipeline classificationUnder construction; not full commercial operation
Verification resultReviewed; some legacy fields unconfirmed
Unconfirmed legacy fieldsGrid / REZ connection
Capacity basisPublished proposal or study design; not committed capacity
Storage basisPublished design / tender figure; see qualifications
Cost basis22 Oct 2026 target A$22.2bn; A$25bn scenario allowance
Last checked2026-11-10
Source access limitationsPublic page text or indexed primary-source evidence reviewed; publisher updates may lag events.

Economics

Estimated costA$22.2 bn

Sources & location

Primary source ↗ Secondary source ↗ Reviewed evidence 1 ↗ Reviewed evidence 2 ↗

Source quality: Owner / regulator evidence; see field-level qualifications

Indicative location
Talbingo / Snowy Mountains region · New South Wales
Regional anchor — not a verified project-site coordinate.
Anchor source ↗
View on the full map →
← Back to all projects

Working on this project?

Share useful sources, ask practical questions and connect with others interested in Australian pumped hydro.

Professional enquiries Join the LinkedIn group