Baroota Pumped Hydro is a historically announced 250 MW energy storage proposal in South Australia's Southern Flinders Ranges.

250 MW · generation
— GWh · storage
— hours · design duration

Overview

Baroota Pumped Hydro is a historically announced 250 MW energy storage proposal in South Australia’s Southern Flinders Ranges. The 2019 investment announcement involved UPC–AC Renewables and Rise Renewables. The concept used SA Water’s existing Baroota Reservoir as lower storage, with a new upper storage, waterways and power station. Historical announcements establish the project concept, but this review did not confirm a current construction program, commissioning date or updated cost. Baroota should be presented as a proposal with unconfirmed current progress. Historical start-date expectations must not be republished as current delivery commitments.

Historical investment announcement confirmed; current development milestone not established.

Key technical details

Developer / ownerUPC–AC Renewables / Rise Renewables in 2019 announcement; current ownership not fully reconfirmed
Scheme typePHES proposal
Open / closed loopOpen-loop / existing reservoir linked
Greenfield / brownfieldHybrid brownfield / greenfield
Reservoir configurationExisting Baroota Reservoir and proposed upper reservoir.
Lower reservoirBaroota Reservoir
Upper reservoirProposed upper reservoir
Water source / first fillBaroota Reservoir / SA Water arrangements to confirm.
Grid / REZ connectionHistorical proposed connection shared with Bridle Track Solar to 275 kV Bungama–Davenport line
Power / energy basisHistorical 250 MW concept confirmed. Prior 2 GWh / 8h not reconfirmed from reviewed primary evidence and removed.
Brownfield basisWould use existing Baroota Reservoir as lower storage with new upper storage.

Status, approvals & verification

StatusHistorically announced / current progress unconfirmed
Status detailHistorical investment announcement confirmed; current development milestone not established.
Planning / approvals statusHistorical proposal; current approval validity and development status unconfirmed.
Target COD / timingTBC
Pipeline classificationCurrent progress unconfirmed; exclude from committed totals
Verification resultHistorical announcement confirmed; current progress unconfirmed
Capacity basisPublished proposal or study design; not committed capacity
Storage basisNot confirmed
Cost basisNot confirmed / not applicable
Last checked2026-11-10
Source access limitationsPublic page text or indexed primary-source evidence reviewed; publisher updates may lag events.

Sources & location

Primary source ↗ Secondary source ↗ Reviewed evidence 1 ↗ Reviewed evidence 2 ↗

Source quality: Historical primary evidence; current progress unconfirmed

Indicative location
Port Augusta / upper Spencer Gulf region · South Australia
Regional anchor — not a verified project-site coordinate.
Anchor source ↗
View on the full map →
← Back to all projects

Working on this project?

Share useful sources, ask practical questions and connect with others interested in Australian pumped hydro.

Professional enquiries Join the LinkedIn group