Phoenix Pumped Hydro, also called Yarrabin, is ACEN Australia's proposed 800 MW storage project about 35 kilometres west of Mudgee in New South Wales.

800 MW · generation
11.99 GWh · storage
15 hours · design duration

Overview

Phoenix Pumped Hydro, also called Yarrabin, is ACEN Australia’s proposed 800 MW storage project about 35 kilometres west of Mudgee in New South Wales. It would use purpose-built off-stream reservoirs and initially source water from Lake Burrendong. ACEN describes 12 hours of output with maximum storage of 15 hours, while the LTESA tender register records 11,990 MWh. The NSW Government declared the project critical infrastructure in February 2026 and cited an A$3.6 billion value. The project remains in early planning, with environmental assessment and investment steps still required.

Early planning and feasibility; LTESA awarded February 2025; CSSI declared 6 February 2026.

Key technical details

Developer / ownerACEN Australia
Scheme typeClosed-loop PHES
Open / closed loopClosed-loop / off-stream
Greenfield / brownfieldGreenfield
Reservoir configurationPurpose-built off-stream upper and lower reservoirs.
Lower reservoirNew lower reservoir near Burrendong
Upper reservoirNew upper reservoir
Water source / first fillInitial fill from Lake Burrendong; operational top-ups for losses.
Grid / REZ connectionCentral-West Orana REZ or existing 330 kV network
Power / energy basisASL tender award: 800 MW / 11,990 MWh. Owner: 800 MW for 12h with maximum storage of 15h. These are different published bases.
Brownfield basisPurpose-built off-stream reservoirs on WaterNSW/private land; not reusing a mine pit.

Status, approvals & verification

StatusPlanning / CSSI / LTESA-backed
Status detailEarly planning and feasibility; LTESA awarded February 2025; CSSI declared 6 February 2026.
Planning / approvals statusCSSI declared 6 February 2026; comprehensive assessment still required.
Target COD / timingNo firm COD confirmed; subject to approvals, grid connection and investment
Pipeline classificationProposal; exclude from committed totals
Verification resultReviewed; source-supported with stated qualifications
Capacity basisPublished proposal or study design; not committed capacity
Storage basisPublished design / tender figure; see qualifications
Cost basisIndicative published estimate; not a funding commitment or current outturn
Last checked2026-11-10
Source access limitationsPublic page text or indexed primary-source evidence reviewed; publisher updates may lag events.

Economics

Estimated costA$3.6 bn
Jobs (construction)600

Sources & location

Primary source ↗ Secondary source ↗ Reviewed evidence 1 ↗ Reviewed evidence 2 ↗ Reviewed evidence 3 ↗

Source quality: Owner / regulator evidence; see field-level qualifications

Indicative location
Mudgee region · New South Wales
Regional anchor — not a verified project-site coordinate.
Anchor source ↗
View on the full map →
← Back to all projects

Working on this project?

Share useful sources, ask practical questions and connect with others interested in Australian pumped hydro.

Professional enquiries Join the LinkedIn group