Capricornia Pumped Hydro

Near Mackay / Central Queensland · Queensland

Capricornia Pumped Hydro is a proposed 750 MW energy storage project approximately 80 kilometres west of Mackay in Central Queensland.

750 MW · generation
12 GWh · storage
16 hours · design duration

Overview

Capricornia Pumped Hydro is a proposed 750 MW energy storage project approximately 80 kilometres west of Mackay in Central Queensland. The developer publishes 12 GWh of storage, or about 16 hours at rated output. Backed by Copenhagen Infrastructure Partners, the project would create a new upper reservoir and a new in-stream lower reservoir on the Broken River downstream of Eungella Dam. It would connect to the Strathmore–Nebo transmission line. Environmental assessment and QIC’s further commercial assessment are ongoing. The project is a proposal and has not been confirmed as an operating or fully funded asset.

EIS active; preliminary draft EIS submitted for adequacy review. QIC further commercial assessment continues.

Key technical details

Developer / ownerCapricornia Pumped Hydro / CI QLD PHES 1 Trust and CI QLD Infrastructure 1; backed by Copenhagen Infrastructure Partners
Scheme typeClosed-loop PHES
Open / closed loopClosed-loop
Greenfield / brownfieldGreenfield
Reservoir configurationTwo new reservoirs; does not simply use Eungella Dam as lower storage.
Lower reservoirNew in-stream reservoir on Broken River downstream of Eungella Dam
Upper reservoirNew valley-infill upper reservoir
Water source / first fillProject water source to be confirmed in approvals.
Grid / REZ connection18 km line and substation to Strathmore–Nebo 275 kV line
Power / energy basisProject site states 750 MW, 12 GWh, around 16 hours.
Brownfield basisNo major existing reservoir or mine-pit reuse identified in public summary.

Status, approvals & verification

StatusPlanning / EIS
Status detailEIS active; preliminary draft EIS submitted for adequacy review. QIC further commercial assessment continues.
Planning / approvals statusCoordinated project; EIS active; federal controlled action. Project declaration lapse extended to 25 March 2027.
Target COD / timingDeveloper timeline shows approvals and construction in 2027–2033; conditional
Pipeline classificationProposal; exclude from committed totals
Verification resultReviewed; some legacy fields unconfirmed
Unconfirmed legacy fieldsWater source / first fill
Capacity basisPublished proposal or study design; not committed capacity
Storage basisPublished design / tender figure; see qualifications
Cost basisIndicative published estimate; not a funding commitment or current outturn
Last checked2026-11-10
Source access limitationsPublic page text or indexed primary-source evidence reviewed; publisher updates may lag events.

Economics

Estimated costA$2.87 bn
Jobs (construction)600
Jobs (operating)65

Sources & location

Primary source ↗ Secondary source ↗ Reviewed evidence 1 ↗ Reviewed evidence 2 ↗ Reviewed evidence 3 ↗ Reviewed evidence 4 ↗ Reviewed evidence 5 ↗

Source quality: Owner / regulator evidence; see field-level qualifications

Indicative location
Mackay region · Queensland
Regional anchor — not a verified project-site coordinate.
Anchor source ↗
View on the full map →
← Back to all projects

Working on this project?

Share useful sources, ask practical questions and connect with others interested in Australian pumped hydro.

Professional enquiries Join the LinkedIn group