Shoalhaven Hydro Expansion

Shoalhaven / New South Wales · New South Wales

Shoalhaven Hydro Expansion was a proposal to expand Origin Energy's existing pumped hydro scheme in New South Wales.

235 MW · former design
5.64 GWh · indicative
24 hours · former design

Overview

Shoalhaven Hydro Expansion was a proposal to expand Origin Energy’s existing pumped hydro scheme in New South Wales. EnergyCo’s grant register records a 235 MW, 24-hour development design, implying 5.64 GWh. The federal EPBC portal now marks the expansion project as withdrawn. These ratings therefore describe a former proposal rather than new capacity being delivered. The operating 240 MW Shoalhaven Scheme continues to be recorded separately. Public project descriptions should state the withdrawal prominently and should not interpret historical grant-stage procurement information as a current construction milestone.

Federal EPBC record 2022/09293 lists Project Withdrawn. Former 235 MW / 24h grant-stage design retained as historical.

Key technical details

Developer / ownerOrigin Energy
Scheme typeExpansion proposal
Open / closed loopOpen-loop / existing water scheme linked
Greenfield / brownfieldBrownfield expansion
Reservoir configurationFormer proposed expansion of existing Shoalhaven scheme
Lower reservoirExisting Shoalhaven Scheme lower storage
Upper reservoirExisting/proposed upper storage
Water source / first fillExisting Shoalhaven scheme context; no active expansion supply commitment
Grid / REZ connectionNSW NEM
Power / energy basisEnergyCo grant table says 235 MW, 24 hours; storage calculated.
Brownfield basisExpansion of existing Shoalhaven PHES scheme.

Status, approvals & verification

StatusWithdrawn / prior feasibility
Status detailFederal EPBC record 2022/09293 lists Project Withdrawn. Former 235 MW / 24h grant-stage design retained as historical.
Planning / approvals statusEPBC project withdrawn; historical grant-register procurement stage is not current delivery status.
Target COD / timingWithdrawn; no current delivery target
Pipeline classificationHistorical; exclude from active pipeline
Verification resultReviewed; some legacy fields unconfirmed
Unconfirmed legacy fieldsLower reservoir; Upper reservoir; Grid / REZ connection
Capacity basisFormer proposed design; not active capacity
Storage basisCalculated / indicative; see power/energy basis
Cost basisNot confirmed / not applicable
Last checked2026-11-10
Source access limitationsPublic page text or indexed primary-source evidence reviewed; publisher updates may lag events.

Sources & location

Primary source ↗ Secondary source ↗ Reviewed evidence 1 ↗ Reviewed evidence 2 ↗

Source quality: Owner / regulator evidence; see field-level qualifications

Indicative location
Kangaroo Valley · New South Wales
Regional anchor — not a verified project-site coordinate.
Anchor source ↗
View on the full map →
← Back to all projects

Working on this project?

Share useful sources, ask practical questions and connect with others interested in Australian pumped hydro.

Professional enquiries Join the LinkedIn group