| Project Name | Big-T Pumped Hydro |
| Status | Permitting / EIS |
| COD (Planned / Actual) | 2026–2033 |
| Capacity (MW) | 400 |
| Energy Storage (GWh) | 4 |
| Duration (Hours) | 10 |
| Head (m) | 300 |
| Upper Reservoir Name | Mount Sevastopol (planned) |
| Lower Reservoir Name | Lake Cressbrook |
| Closed-Loop or Open-Loop | Closed-Loop |
| Location (State, Region) | QLD – Toowoomba Region |
| Coordinates | ~27.2° S, 152.2° E |
| Developer / Owner | BE Power / Stanwell Corporation |
| Transmission Link | QLD Grid |
| Estimated Cost (AUD) | 2 billion (est.) |
| Funding / Partners | Stanwell, GE Renewable Energy |
| Environmental Status | EIS underway |
| Construction Timeline | 2024–2033 |
| Job Creation (FTEs) | 200-300 |
| Integration Role | Grid firming, battery hybrid |
| Website | https://www.stanwell.com |
| References | QLD Gov; BE Power; EIS documents |