| Project Name | Cultana Pumped Hydro |
| Status | Proposed |
| COD (Planned / Actual) | — |
| Capacity (MW) | 225 |
| Energy Storage (GWh) | 1.8 |
| Duration (Hours) | 8 |
| Head (m) | 300 |
| Upper Reservoir Name | TBD |
| Lower Reservoir Name | Gulf of Spencer (seawater) |
| Closed-Loop or Open-Loop | Closed-Loop (Seawater) |
| Location (State, Region) | SA – Cultana |
| Coordinates | ~32.6° S, 137.8° E |
| Developer / Owner | Hydrostor |
| Transmission Link | SA grid |
| Estimated Cost (AUD) | — |
| Funding / Partners | ARENA |
| Environmental Status | Pre-approval |
| Construction Timeline | — |
| Job Creation (FTEs) | — |
| Integration Role | Demonstration of seawater PHES |
| Website | https://www.hydrostor.ca |
| References | Hydrostor; ARENA |