Tribute PHES (Lake Plimsoll-Murchison)

Project Details

Project Name Tribute PHES (Lake Plimsoll-Murchison)
Status Prefeasibility
COD (Planned / Actual)
Capacity (MW) 500
Energy Storage (GWh) 15
Duration (Hours) 30
Head (m) 300
Upper Reservoir Name Lake Plimsoll
Lower Reservoir Name Lake Murchison
Closed-Loop or Open-Loop Closed-Loop
Location (State, Region) TAS – West Coast
Coordinates ~42.0° S, 145.6° E
Developer / Owner Hydro Tasmania
Transmission Link Marinus Link
Estimated Cost (AUD)
Funding / Partners Hydro Tasmania; ARENA
Environmental Status Prefeasibility
Construction Timeline
Job Creation (FTEs)
Integration Role Battery of the Nation
Website https://www.hydro.com.au
References Hydro Tasmania; ARENA