| Project Name | Baroota PHES |
| Status | Proposed |
| COD (Planned / Actual) | — |
| Capacity (MW) | 270 |
| Energy Storage (GWh) | 2.2 |
| Duration (Hours) | 8 |
| Head (m) | 300 |
| Upper Reservoir Name | TBD |
| Lower Reservoir Name | Baroota Reservoir |
| Closed-Loop or Open-Loop | Open-Loop |
| Location (State, Region) | SA – Southern Flinders |
| Coordinates | ~32.5° S, 138.0° E |
| Developer / Owner | Rise Renewables |
| Transmission Link | SA Grid |
| Estimated Cost (AUD) | — |
| Funding / Partners | Private |
| Environmental Status | Planning |
| Construction Timeline | — |
| Job Creation (FTEs) | — |
| Integration Role | Firming South Australian REZ |
| Website | https://riserenewables.com.au |
| References | SA Govt; Developer materials |