Planning / EIS APH-PLAN-003

Big-T Pumped Hydropower Energy Storage

Lake Cressbrook / Toowoomba-Somerset · Queensland

Big-T Pumped Hydropower Energy Storage is a proposed 400 MW project near Lake Cressbrook, northeast of Toowoomba in Queensland.

400 MW · generation
4 GWh · indicative
10 hours · design duration

Overview

Big-T Pumped Hydropower Energy Storage is a proposed 400 MW project near Lake Cressbrook, northeast of Toowoomba in Queensland. The design pairs the existing lake with a new upper reservoir on Mount Sevastopol and an underground power station. Ten hours of generation at rated output implies 4 GWh of pumped hydro storage. The planning application also includes a separate 200 MWh battery, which is excluded from that figure. Queensland’s register lists the EIS as active, an indicative investment of up to A$1.3 billion, and no confirmed construction start.

Draft EIS being prepared; declaration lapse extended to 30 October 2028. Not included in QIC's further-assessment pair.

Key technical details

Developer / ownerCressbrook Project Co Pty Ltd / Big-T Unit Trust
Scheme typePHES with BESS component
Open / closed loopOpen-loop / existing dam linked
Greenfield / brownfieldHybrid brownfield / greenfield
Reservoir configurationNew upper reservoir on Mt Sevastopol and existing Lake Cressbrook as lower reservoir.
Lower reservoirLake Cressbrook
Upper reservoirMt Sevastopol upper reservoir
Water source / first fillLake Cressbrook / project water arrangements.
Grid / REZ connection15 km underground 275 kV connection and switching station
Power / energy basisCoordinator-General states up to 400 MW for 10 hours.
Brownfield basisUses existing Lake Cressbrook as lower reservoir; builds new upper reservoir.

Status, approvals & verification

StatusPlanning / EIS
Status detailDraft EIS being prepared; declaration lapse extended to 30 October 2028. Not included in QIC's further-assessment pair.
Planning / approvals statusEIS active; declaration lapse extended on 17 April 2026 to 30 October 2028.
Target COD / timingTBC
Pipeline classificationProposal; exclude from committed totals
Verification resultReviewed; some legacy fields unconfirmed
Unconfirmed legacy fieldsWater source / first fill
Capacity basisPublished proposal or study design; not committed capacity
Storage basisCalculated / indicative; see power/energy basis
Cost basisIndicative published estimate; not a funding commitment or current outturn
Last checked2026-11-10
Source access limitationsPublic page text or indexed primary-source evidence reviewed; publisher updates may lag events.

Economics

Estimated costA$1.3 bn
Jobs (construction)350
Jobs (operating)10

Sources & location

Primary source ↗ Secondary source ↗ Reviewed evidence 1 ↗ Reviewed evidence 2 ↗

Source quality: Owner / regulator evidence; see field-level qualifications

Indicative location
Toowoomba region · Queensland
Regional anchor — not a verified project-site coordinate.
Anchor source ↗
View on the full map →
← Back to all projects

Working on this project?

Share useful sources, ask practical questions and connect with others interested in Australian pumped hydro.