Big-G Pumped Hydropower Energy Storage is BE Power's proposed closed-loop scheme at Mount Alma on Queensland's Calliope Range.

800 MW · generation
9.6 GWh · indicative
12 hours · design duration

Overview

Big-G Pumped Hydropower Energy Storage is BE Power’s proposed closed-loop scheme at Mount Alma on Queensland’s Calliope Range. The design allows up to 800 MW of generation for up to 12 hours, implying 9.6 GWh of energy storage. It can be configured as one 800 MW scheme or two 400 MW modules with separate upper reservoirs and a shared lower reservoir. The federal referral is awaiting an assessment approach decision. BE Power publishes an estimated A$2.3 billion project cost. Grid connections and initial water-supply arrangements require further development.

Early design and environmental referral; federal assessment approach not yet determined.

Key technical details

Developer / ownerBE Power Group
Scheme typeModular closed-loop PHES
Open / closed loopClosed-loop
Greenfield / brownfieldGreenfield
Reservoir configurationTwo upper reservoir areas and one shared new lower reservoir; modular 800 MW or two 400 MW arrangement.
Lower reservoirNew lower reservoir
Upper reservoirNew upper reservoir
Water source / first fillDeveloper proposes a pipeline connection to the ACP pipeline; water licence and supply arrangements remain under discussion.
Grid / REZ connectionNew privately owned transmission line to NEM
Power / energy basisEPBC referral states up to 800 MW and up to 12 hours; storage calculated.
Brownfield basisNo reuse basis identified in referral summary.

Status, approvals & verification

StatusEarly planning / EPBC referral
Status detailEarly design and environmental referral; federal assessment approach not yet determined.
Planning / approvals statusEPBC 2024/10056: Awaiting Assessment Approach Decision.
Target COD / timingTBC
Pipeline classificationProposal; exclude from committed totals
Verification resultReviewed; source-supported with stated qualifications
Capacity basisPublished proposal or study design; not committed capacity
Storage basisCalculated / indicative; see power/energy basis
Cost basisIndicative published estimate; not a funding commitment or current outturn
Last checked2026-11-10
Source access limitationsPublic page text or indexed primary-source evidence reviewed; publisher updates may lag events.

Economics

Estimated costA$2.3 bn

Sources & location

Primary source ↗ Secondary source ↗ Reviewed evidence 1 ↗ Reviewed evidence 2 ↗

Source quality: Owner / regulator evidence; see field-level qualifications

Indicative location
Gladstone region · Queensland
Regional anchor — not a verified project-site coordinate.
Anchor source ↗
View on the full map →
← Back to all projects

Working on this project?

Share useful sources, ask practical questions and connect with others interested in Australian pumped hydro.

Professional enquiries Join the LinkedIn group