Cethana Pumped Hydro

Lake Cethana / northwest Tasmania · Tasmania

Cethana Pumped Hydro is Hydro Tasmania's proposed 750 MW long-duration storage scheme in northwest Tasmania.

750 MW · generation
15 GWh · indicative
20 hours · design duration

Overview

Cethana Pumped Hydro is Hydro Tasmania’s proposed 750 MW long-duration storage scheme in northwest Tasmania. The design uses Lake Cethana as the lower reservoir, a new upper reservoir to the west, an underground power station and a transmission connection towards Staverton. Hydro Tasmania describes 20 hours of storage, implying about 15 GWh at rated output. Its June 2026 approvals update confirms a federal Public Environment Report process alongside state and local assessment. The project has not reached a final investment decision and also requires Tasmanian parliamentary approval.

Environmental documentation and planning approvals in progress; no final investment decision.

Key technical details

Developer / ownerHydro Tasmania
Scheme typeLong-duration PHES
Open / closed loopOpen-loop / existing hydro scheme linked
Greenfield / brownfieldHybrid brownfield / greenfield
Reservoir configurationExisting Lake Cethana and new off-river upper storage.
Lower reservoirLake Cethana
Upper reservoirNew off-river upper storage west of Lake Cethana
Water source / first fillMersey-Forth hydropower scheme / Lake Cethana.
Grid / REZ connectionNew transmission line to Staverton, primarily along an existing corridor
Power / energy basisHydro Tasmania states 750 MW and 20 hours; storage calculated.
Brownfield basisUses existing Lake Cethana as lower storage; builds new off-river upper storage.

Status, approvals & verification

StatusPlanning / approvals
Status detailEnvironmental documentation and planning approvals in progress; no final investment decision.
Planning / approvals statusFederal controlled action assessed by Public Environment Report; state EIS and development application preparation; Tasmanian Parliament approval also required.
Target COD / timingNo firm COD confirmed; developer estimates 6–8 years of construction
Pipeline classificationProposal; exclude from committed totals
Verification resultReviewed; some legacy fields unconfirmed
Unconfirmed legacy fieldsWater source / first fill
Capacity basisPublished proposal or study design; not committed capacity
Storage basisCalculated / indicative; see power/energy basis
Cost basisNot confirmed / not applicable
Last checked2026-11-10
Source access limitationsPublic page text or indexed primary-source evidence reviewed; publisher updates may lag events.

Economics

Jobs (construction)350

Sources & location

Primary source ↗ Secondary source ↗ Reviewed evidence 1 ↗ Reviewed evidence 2 ↗

Source quality: Owner / regulator evidence; see field-level qualifications

Indicative location
Cethana locality · Tasmania
Regional anchor — not a verified project-site coordinate.
Anchor source ↗
View on the full map →
← Back to all projects

Working on this project?

Share useful sources, ask practical questions and connect with others interested in Australian pumped hydro.

Professional enquiries Join the LinkedIn group