PumpedHydro
Early planning / CSSI APH-PLAN-009

Western Sydney Pumped Hydro

Lake Burragorang / upstream of Warragamba Dam · New South Wales

Western Sydney Pumped Hydro is ZEN Energy's proposed 1,000 MW storage project at Lake Burragorang in New South Wales.

1,000 MW · generation
8 GWh · indicative
8 hours · design duration

Overview

Western Sydney Pumped Hydro is ZEN Energy’s proposed 1,000 MW storage project at Lake Burragorang in New South Wales. The proposal would repurpose a disused coal washery site and use WaterNSW land and reservoirs. WaterNSW describes up to eight hours of output, implying 8 GWh at rated capacity. The NSW Government declared the A$3.5 billion proposal critical infrastructure in February 2026. It remains in feasibility and planning. Protecting the quality and quantity of Sydney’s drinking-water supply is a central condition of WaterNSW’s consideration of the project.

Feasibility and early planning under WaterNSW development agreement; CSSI declared 6 February 2026.

Key technical details

Developer / ownerZEN Energy
Scheme typePHES using WaterNSW land/assets
Open / closed loopOpen-loop / water-supply reservoir linked
Greenfield / brownfieldBrownfield / rehabilitated industrial site
Reservoir configurationFormer coal washery upper storage and Lake Burragorang lower reservoir.
Lower reservoirLake Burragorang
Upper reservoirDisused coal washery site proposed for upper storage
Water source / first fillLake Burragorang; WaterNSW water quality constraints.
Grid / REZ connectionWestern Sydney / NSW NEM
Power / energy basisWaterNSW states 1 GW for up to 8 continuous hours; storage calculated.
Brownfield basisRepurposes disused coal washery site as upper storage; lower source is Lake Burragorang.

Status, approvals & verification

StatusEarly planning / CSSI
Status detailFeasibility and early planning under WaterNSW development agreement; CSSI declared 6 February 2026.
Planning / approvals statusCSSI declared; comprehensive environmental assessment and approvals still required.
Target COD / timingTBC
Pipeline classificationProposal; exclude from committed totals
Verification resultReviewed; some legacy fields unconfirmed
Unconfirmed legacy fieldsWater source / first fill; Grid / REZ connection
Capacity basisPublished proposal or study design; not committed capacity
Storage basisCalculated / indicative; see power/energy basis
Cost basisIndicative published estimate; not a funding commitment or current outturn
Last checked2026-11-10
Source access limitationsPublic page text or indexed primary-source evidence reviewed; publisher updates may lag events.

Economics

Estimated costA$3.5 bn
Jobs (construction)1500
Jobs (operating)80

Sources & location

Primary source ↗ Secondary source ↗ Reviewed evidence 1 ↗ Reviewed evidence 2 ↗

Source quality: Owner / regulator evidence; see field-level qualifications

Indicative location
Lake Burragorang region · New South Wales
Regional anchor — not a verified project-site coordinate.
Anchor source ↗
View on the full map →
← Back to all projects

Working on this project?

Share useful sources, ask practical questions and connect with others interested in Australian pumped hydro.

Professional enquiries Join the LinkedIn group