PumpedHydro
Environmental assessment APH-PLAN-012

Muswellbrook Pumped Hydro

Muswellbrook / Hunter-Central Coast REZ · New South Wales

Muswellbrook Pumped Hydro is a proposed energy storage project at the former Muswellbrook Coal Mine in the Hunter Valley, New South Wales.

500 MW · generation
4 GWh · indicative
8 hours · design duration

Overview

Muswellbrook Pumped Hydro is a proposed energy storage project at the former Muswellbrook Coal Mine in the Hunter Valley, New South Wales. The AGL and Idemitsu Australia joint venture is studying up to 500 MW of capacity with eight hours of storage, implying 4 GWh. The mine void would become the lower reservoir and a new upper reservoir would be built on Bells Mountain. The developer proposes initial filling and top-ups with water piped from the Hunter River. The project is preparing an EIS and has critical infrastructure status, but remains subject to assessment and investment.

EIS assessments underway against revised SEARs; proposed capacity up to 500 MW / 8 hours.

Key technical details

Developer / ownerMuswellbrook Pumped Hydro Pty Ltd (AGL / Idemitsu JV)
Scheme typeMine-site PHES
Open / closed loopClosed-loop / mine-site
Greenfield / brownfieldBrownfield
Reservoir configurationMine void lower reservoir and Bells Mountain upper reservoir.
Lower reservoirMuswellbrook mine void
Upper reservoirBells Mountain
Water source / first fillDeveloper proposes Hunter River water piped to the mine-void lower reservoir for initial fill and top-ups.
Grid / REZ connectionNearby high-voltage lines / Hunter-Central Coast REZ
Power / energy basisProject page says up to 500 MW with 8 hours; earlier grant basis was 250 MW.
Brownfield basisUses existing Muswellbrook mine void as lower reservoir.

Status, approvals & verification

StatusEnvironmental assessment
Status detailEIS assessments underway against revised SEARs; proposed capacity up to 500 MW / 8 hours.
Planning / approvals statusCSSI; SEARs issued/revised; EIS preparation.
Pipeline classificationProposal; exclude from committed totals
Verification resultReviewed; source-supported with stated qualifications
Capacity basisPublished proposal or study design; not committed capacity
Storage basisCalculated / indicative; see power/energy basis
Cost basisNot confirmed / not applicable
Last checked2026-11-10
Source access limitationsPublic page text or indexed primary-source evidence reviewed; publisher updates may lag events.

Economics

Jobs (construction)650
Jobs (operating)20

Sources & location

Primary source ↗ Secondary source ↗ Reviewed evidence 1 ↗

Source quality: Owner / regulator evidence; see field-level qualifications

Indicative location
Muswellbrook locality · New South Wales
Regional anchor — not a verified project-site coordinate.
Anchor source ↗
View on the full map →
← Back to all projects

Working on this project?

Share useful sources, ask practical questions and connect with others interested in Australian pumped hydro.