Shoalhaven Hydro Expansion was a proposal to expand Origin Energy's existing pumped hydro scheme in New South Wales.
Shoalhaven Hydro Expansion was a proposal to expand Origin Energy’s existing pumped hydro scheme in New South Wales. EnergyCo’s grant register records a 235 MW, 24-hour development design, implying 5.64 GWh. The federal EPBC portal now marks the expansion project as withdrawn. These ratings therefore describe a former proposal rather than new capacity being delivered. The operating 240 MW Shoalhaven Scheme continues to be recorded separately. Public project descriptions should state the withdrawal prominently and should not interpret historical grant-stage procurement information as a current construction milestone.
Federal EPBC record 2022/09293 lists Project Withdrawn. Former 235 MW / 24h grant-stage design retained as historical.
Source quality: Owner / regulator evidence; see field-level qualifications
Share useful sources, ask practical questions and connect with others interested in Australian pumped hydro.