PumpedHydro
Environmental assessment / assessment approach determined APH-PLAN-016

Wala Wala Pumped Hydro Energy Storage

Dungowan Valley / Ogunbil, Tamworth LGA · New South Wales

Wala Wala Pumped Hydro Energy Storage is EDF's proposed off-river scheme in the Dungowan Valley near Ogunbil, in the Tamworth local government area of New South Wales.

400 MW · generation
4 GWh · indicative
10 hours · design duration

Overview

Wala Wala Pumped Hydro Energy Storage is EDF’s proposed off-river scheme in the Dungowan Valley near Ogunbil, in the Tamworth local government area of New South Wales. The federal referral covers 300–400 MW, while the developer’s project page describes 300 MW with up to ten hours of storage. The design includes two new reservoirs, an underground power station and a transmission connection. The EPBC portal now lists the assessment approach as determined. Water-supply options, including a possible Dungowan Dam pipeline, remain under investigation. Direct extraction from Dungowan Creek is not proposed.

EPBC 2026/10620 lists Assessment Approach Determined. Owner page still refers to September 2026 referral consultation.

Key technical details

Developer / ownerEDF Power Solutions Australia
Scheme typeClosed-loop PHES
Open / closed loopClosed-loop / off-river
Greenfield / brownfieldGreenfield
Reservoir configurationTwo new off-river reservoirs.
Lower reservoirNew lower reservoir near Dungowan Creek
Upper reservoirNew upper reservoir on plateau
Water source / first fillUnder investigation. Dungowan Dam pipeline option considered; direct extraction from Dungowan Creek is not proposed.
Grid / REZ connectionTransgrid Line 85 or future New England REZ transmission option
Capacity range (MW)300–400 (referral); owner page 300
Power / energy basisEPBC capacity range 300–400 MW; owner page 300 MW / up to 10h. Numeric main columns retain upper case 400 MW / indicative 4 GWh; not a final design.
Brownfield basisNew off-river reservoirs and underground power station.

Status, approvals & verification

StatusEnvironmental assessment / assessment approach determined
Status detailEPBC 2026/10620 lists Assessment Approach Determined. Owner page still refers to September 2026 referral consultation.
Planning / approvals statusEPBC 2026/10620: Assessment Approach Determined; state scoping report published 12 August 2026.
Pipeline classificationProposal; exclude from committed totals
Verification resultReviewed; conflicting published designs
Conflicting fieldsCapacity MW
Capacity basisPublished proposal or study design; not committed capacity
Storage basisCalculated / indicative; see power/energy basis
Cost basisNot confirmed / not applicable
Last checked2026-11-10
Source access limitationsPublic page text or indexed primary-source evidence reviewed; publisher updates may lag events.

Sources & location

Primary source ↗ Secondary source ↗ Reviewed evidence 1 ↗ Reviewed evidence 2 ↗ Reviewed evidence 3 ↗

Source quality: Owner / regulator evidence; see field-level qualifications

Indicative location
Tamworth / Dungowan region · New South Wales
Regional anchor — not a verified project-site coordinate.
Anchor source ↗
View on the full map →
← Back to all projects