Discontinued / negative investment decision APH-PLAN-017

Cultana Seawater Pumped Hydro

Cultana / Port Augusta · South Australia

Cultana Seawater Pumped Hydro was an EnergyAustralia and Arup proposal near Port Augusta in South Australia.

225 MW · former design
1.8 GWh · indicative
8 hours · former design

Overview

Cultana Seawater Pumped Hydro was an EnergyAustralia and Arup proposal near Port Augusta in South Australia. The studied design provided 225 MW with eight hours of storage, implying 1.8 GWh. ARENA records that EnergyAustralia took a negative financial investment decision in November 2019 because the business case was not sufficiently compelling. The funded Phase 2 study ended on 30 October 2020. That completion date refers to the study, not construction of a power station. The concept involved seawater and engineered upper and lower reservoirs, with limited intake and outfall to Spencer Gulf.

ARENA confirms negative FID by EnergyAustralia in November 2019; Phase 2 study completed 30 October 2020.

Key technical details

Developer / ownerEnergyAustralia
Scheme typeSeawater PHES
Open / closed loopSeawater recirculation concept with limited Gulf intake/outfall
Greenfield / brownfieldGreenfield
Reservoir configurationEngineered upper and lower seawater reservoirs with limited intake/outfall to Spencer Gulf.
Lower reservoirEngineered lower seawater reservoir; Spencer Gulf intake/top-ups
Upper reservoirNew engineered upper seawater reservoir
Water source / first fillSpencer Gulf seawater; limited intake/outfall and recirculation
Grid / REZ connectionHistorical proposal to connect at the former Northern Power Station grid point
Power / energy basisHistorical studied design 225 MW / 8h; 1.8 GWh calculated. Negative FID, not active capacity.
Brownfield basisNew seawater pumped hydro infrastructure.

Status, approvals & verification

StatusDiscontinued / negative investment decision
Status detailARENA confirms negative FID by EnergyAustralia in November 2019; Phase 2 study completed 30 October 2020.
Planning / approvals statusStudy completed; negative FID. No operating or construction status established.
Target COD / timingNot proceeding under studied business case
Pipeline classificationHistorical; exclude from active pipeline
Verification resultReviewed; source-supported with stated qualifications
Capacity basisFormer proposed design; not active capacity
Storage basisCalculated / indicative; see power/energy basis
Cost basisNot confirmed / not applicable
Last checked2026-11-10
Source access limitationsPublic page text or indexed primary-source evidence reviewed; publisher updates may lag events.

Sources & location

Primary source ↗ Secondary source ↗ Reviewed evidence 1 ↗

Source quality: Owner / regulator evidence; see field-level qualifications

Indicative location
Port Augusta / upper Spencer Gulf region · South Australia
Regional anchor — not a verified project-site coordinate.
Anchor source ↗
View on the full map →
← Back to all projects

Working on this project?

Share useful sources, ask practical questions and connect with others interested in Australian pumped hydro.

Professional enquiries Join the LinkedIn group