Project Name Status COD Capacity (MW) Energy Storage (GWh)
Baroota PHES Proposed 270 2.2
Big-T Pumped Hydro Permitting / EIS 2026–2033 400 4
Borumba Dam PHES Proposed 2033 2000 48
Cultana Pumped Hydro Proposed 225 1.8
Glenbawn PHES Early-stage 770 7.7
Glennies Creek PHES Early-stage 623 6.2
Goat Hill Pumped Hydro Proposed 230 1.8
Kidston Pumped Hydro Under Construction 2025 250 2
Kiewa PHES conversion Early-stage TBD
Lake Cethana Pumped Hydro Proposed / EPBC Referral 2031 750 15