| Project Name | Goat Hill Pumped Hydro |
| Status | Proposed |
| COD (Planned / Actual) | — |
| Capacity (MW) | 230 |
| Energy Storage (GWh) | 1.8 |
| Duration (Hours) | 8 |
| Head (m) | 300 |
| Upper Reservoir Name | TBD |
| Lower Reservoir Name | TBD |
| Closed-Loop or Open-Loop | Closed-Loop |
| Location (State, Region) | SA – Lincoln Gap |
| Coordinates | ~32.7° S, 137.7° E |
| Developer / Owner | Altura Group |
| Transmission Link | SA grid |
| Estimated Cost (AUD) | — |
| Funding / Partners | Private |
| Environmental Status | Planning |
| Construction Timeline | — |
| Job Creation (FTEs) | — |
| Integration Role | Firming renewables |
| Website | https://alturagroup.com.au |
| References | Altura; SA Govt |