Skip to content
Tribute PHES (Lake Plimsoll-Murchison)
Project Details
| Project Name |
Tribute PHES (Lake Plimsoll-Murchison) |
| Status |
Prefeasibility |
| COD (Planned / Actual) |
— |
| Capacity (MW) |
500 |
| Energy Storage (GWh) |
15 |
| Duration (Hours) |
30 |
| Head (m) |
300 |
| Upper Reservoir Name |
Lake Plimsoll |
| Lower Reservoir Name |
Lake Murchison |
| Closed-Loop or Open-Loop |
Closed-Loop |
| Location (State, Region) |
TAS – West Coast |
| Coordinates |
~42.0° S, 145.6° E |
| Developer / Owner |
Hydro Tasmania |
| Transmission Link |
Marinus Link |
| Estimated Cost (AUD) |
— |
| Funding / Partners |
Hydro Tasmania; ARENA |
| Environmental Status |
Prefeasibility |
| Construction Timeline |
— |
| Job Creation (FTEs) |
— |
| Integration Role |
Battery of the Nation |
| Website |
https://www.hydro.com.au |
| References |
Hydro Tasmania; ARENA |